Project Description
799 Pacific Highway, Chatswood
Through an extensive briefing and design process, Sheldon were able to transform Bisley Group’s workspace from a typical office into one that challenged all the norms.
They required a number of spaces they could use for discussion and collaboration purposes, as well as to work individually and quietly.
The client was open to making the office as different to their existing workspace as possible, eliminating the need for high walls to make way for large open spaces and collaboration zones.
It was also important to highlight the brand values and culture throughout the office via the use of bold graphics and custom panelling.
The end product is a fresh and exciting fitout that celebrates the Bisley Group’s talent and fosters teamwork.
Project Details
AREA
520m2
SERVICES
Design + Construct
DESIGN DURATION
11 Weeks
CONSTRUCTION DURATION
13 Weeks