A challenging timeline with a great end result

Tenix 2018-04-26T07:09:54+00:00

Project Description

Level 18, 40 Mount Street, North Sydney

Tenix had a challenging timing issue for their two level fitout in the renowned Coca Cola building in North Sydney.

Sheldon took over the Design and Construct process after the client became frustrated with the traditional design and tender method.

Once appointed, the Sheldon team had only 12 weeks left in the program – over Christmas – to complete the full design and construct process, including an interlinking stair case.

Excited by the challenge Sheldon completed the project, with exceptional results. The Tenix workspace caters for a high number of work activities with various meeting rooms, booths, casual and formal areas and flexible meeting / training areas.

Tenix were extremely happy with the fitout as Sheldon had successfully translated the brief, adding value along the way with their in-house manufacturing facility, producing excellent quality systems furniture and joinery that met the tight time frame.

The office design has been a standout feature for the users of the space and all who visit, both aesthetically and functionally.

Project Details

AREA

2,260m2

DENSITY

1:12

SERVICES

Design + Construct